Deep hole

road-work

Sarah Pruys

With 6,500 cubic metres of soil now removed from Highway 602 just before Bone Road, T&K Sharp Construction is ready to begin removing the 48-metre concrete culvert that a creek, known as the Rainy River tributary, runs through. Once the culvert is removed, an almost 49-metre bridge will be assembled beside Bone Road and then pushed across onto pilings.

Facebooktwitterredditpinterestlinkedinmail